CHESTERTON METHODIST CHURCH

AT THE HEART OF ALL WE SEEK TO BE AND DO IS FAITH, HOPE AND LOVE.

Phase 1 - 2017 Refurbishment

In 2017 much of the premises were closed for 6 months whilst extensive refurbishment works were carried out, costing around £500,000! Funding for the work was provided by the Cambridge Methodist Circuit, using some of the proceeds of sale of the former Sturton Street Methodist Church. Below is a photo of the reopening event at the end of May 2017, in the presence of the Mayor of Cambridge. You can see the top of the new porch area - the only new addition to the buildings. 

Front Porch